MIL-P-50307(MU)
c e r t i f i c a t i o n w i l l b e r e q u i r e d S h O U l d a n y c h a n g e s o c c u r i n m a t e r i a l s , manu-
facturing processes and techniques previously certified.
TABLE III
CHARACTERISTIC
REQUIREMENT
TEST PROCEDURE
Materials
Applicable drawings
3.1
Fabrication
3.2
Standards, and
General specification
3.3.2
Specifications
(MIL-F-13926)
General specification
3.3.1
(MIL-O-13830)
(except
3.3.lb)
4.5 Inspection equipment.-- Except as otherwise provided for by the
contract, the contractor shall supply and maintain inspection equipment in
accordance with the applicable requirements of MIL-I-45607.
4.5.1 Government furnished inspection equipment.- Where the contract
provides for Government furnished test equipment, supply and maintenance
of test equipment shall be in accordance with the applicable requirements
specified in MIL-I-45607.
4.5.2 Contractor furnished inspection equipment.
4.5.2.1 Government design.- Unless otherwise specified in the con-
t r a c t , all inspection equipment specified by drawing number in specifica-
tions or SQAP forming a part of the contract shall be supplied by the
contractor in accordance with technical data listed in the technical data
package (TDP).
4.5.2.2
Contractor design.- The contractor shall provide inspection
equipment compatible with the "Test Methods and Procedures" specified in
4 . 6 o f t h i s s p e c i f i c a t i o n a n d w i t h t h e "Component Inspection" and "Test
F a c i l i t i e s " requirements of MIL-F-13926. Since tolerance of test equip-
ment is normally considered to be within 10% of the product tolerance for
which it is intended, this inherent error in the test equipment design
must be considered as part of the prescribed product tolerance limit.
Thus , c o n c e p t , c o n s t r u c t i o n , m a t e r i a l s , d i m e n s i o n s a n d t o l e r a n c e s u s e d i n
the design of test equipment shall be so selected and controlled as to
insure that the test equipment will reliably indicate acceptability of a
product which does not exceed 90% of the prescribed tolerance limit, and
permit positive rejection when non-conforming.
Construction shall be
such as to facilitate routine calibration of test equipment.
4.5.2.3 Inspection equipment design requirements,- Inspection
equipment provided in accordance with 4.5.2.2 shall meet the following
requirements:
a.
Environmental and mechanical test equipment-
Tempera-
t u r e , humidity, and vibration test equipment shall conform to applicable
3
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business