MIL-P-50307(MU)
which time vertify no displacement (other than rotation herein) in axis A
from its initial position. Prior to and after completing each operational
cycle, as defined herein, verify that a line of sight along the established
geometric axis (line W in Figure 1) intersects the center of the projected
reticle image in elevation and depression within specified limits.
Each
handling cycle shall consist of moving Arm 10547473 from its operating to
stowed to operating positions; elevating and depressing the projector as
previously specified in this test; and removing the projector from its
medium and again reinserting and repositioning the projector in its hold-
.
ing m e d i u m .
5.
PREPARATION FOR DELIVERY
5 . 1 P a c k a g i n g , P a c k i n g , a n d M a r k i n~ . - P a c k a g i n g , p a c k i n g a n d m a r k -
ing of Projector, Reticle Image:
10547353 shall be in accordance w i t h
packaging data sheet 10547353. T h e l e v e l o f p r o t e c t i o n s h a l l b e a s s p e c i -
fied in the procurement document.
NOTES
6.
6.1 Intended Use - The projector covered by this specification is
intended for use with a support and bracket assembly as an integral part
of Sight, Reflex: XM70E1 (MIL-S-60828), which is used by the pilots of
(OH-6A and OH-58A) helicopters to obtain a high probability first round
hit.
6.2 Ordering Data - Procurement documents should specify the following:
Title, number and date of this specification
a.
b.
Selection of applicable levels of preservation,
packaging and packing
c.
Applicable packaging data sheet number (see 5.1)
d.
Applicable stock number
e.
Requirement for First Article Testing (see 4.2)
Custodian:
Preparing
activity:
Army-MU
Army -MU
Project No.
.
16
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business